Chinese South-to-North Water Diversion Automatic Controlling System Project


Chinese South-to-North Water Diversion East Line first stage construction pump station automatic system project


1


Datun Reservoir is located in the east of Dezhou Wucheng County, Shangdong province, it is the terminal station of the 1st phase East Route of South-to-North Water Diversion Project. The design water storage level of the reservoir is 29.8m, the corresponding maximum storage capacity is 52.09 million m3. The annual urban water supply to Decheng district in Dezhou City is 109.19 million m3, and 15.83m3 to Wucheng County.


The development and design of its Computer Automatic Controlling System (CACS) was provided by HNAC.
2


Gate

Centre Controlling Center.

4
10 kV transformer room