LIVE CHAT
We are here to help you

Previous post Next Post

Relevant Products

Hydropower oluptulm

Client: HANC
Date: Mar 16,2017
Info: Phasellus ultrices t
Launch Project

Chile ROBLERIA Hydropower Project

2

penstock


3

booster station


Project Overview:

ROBLERIA Hydropower Project locates in Linares town, the 7th region of Chile, 350km away from Santiago.

  • Design head: 128m

    Design discharge: 3.6 m3 /second

    Installed capacity: 4MW (a horizontal Francis turbine)

    Annual output: 26.187MWh

  • Project duration: officially approved in 2010, and started power generation in Feb. 2013;


4

booster station


5

MV Switchgear

Contact purchase