Chile ROBLERIA Hydropower Project
penstock
booster station
Project Overview:
ROBLERIA Hydropower Project locates in Linares town, the 7th region of Chile, 350km away from Santiago.
Design head: 128m
Design discharge: 3.6 m3 /second
Installed capacity: 4MW (a horizontal Francis turbine)
Annual output: 26.187MWh
Project duration: officially approved in 2010, and started power generation in Feb. 2013;